GE Vernova

Heavy-duty gas turbine and grid-equipment manufacturer whose multi-year slot backlog has become the real pacing item for AI datacenter buildouts.

Coverage: 1 pieceNext earnings: Per IR calendarStack role: Power Generation & High-Voltage Grid Equipment OEM (Gas Turbines, Transformers, Switchgear, and Wind)Dossier updated: 2026-11-26
Company DossierAs of 2026-11-26

Overview & AI Stack Role

Power Generation & High-Voltage Grid Equipment OEM (Gas Turbines, Transformers, Switchgear, and Wind)

GE Vernova manufactures the physical hardware that stands between an AI datacenter press release and an energized substation: heavy-duty and aeroderivative gas turbines, high-voltage transformers, switchgear, HVDC grid systems, and wind turbines. Across its Power, Electrification, and Wind segments, the company enters late 2026 with $197 billion in total remaining performance obligations and expects backlog to cross $200 billion in the fourth quarter.

Demand from utilities and datacenter developers has turned GE Vernova's turbine factories into a multi-year queue. By September 30, 2026, Gas Power held 122 GW of equipment backlog (64 GW) and slot reservation agreements (58 GW), with management projecting at least 130 GW under contract by year-end against an annualized factory output scaling from 20 GW in Q3 2026 to 24 GW in 2028.

Rather than just collecting turbine deposits, GE Vernova is using its cash surge ($15.31 billion in 9M 2026 free cash flow) to roll up grid bottlenecks, closing the Prolec GE buyout in February 2026 and agreeing on October 28, 2026 to acquire high-voltage component maker Trench Group for $9.0 billion. Every megawatt will be monetized, preferably with a non-refundable slot reservation deposit and a 20-year service contract attached.

Fundamental Snapshot

Primary filings & IR · As of 2026-11-26
MetricReportedPeriod / Context
Total Revenue$12.64B ($33.08B 9M)
Q3 2026 / 9M 2026
Q3 revenue rose 27% GAAP (+18% organic), led by Power ($6.07B) and Electrification ($3.86B).
Orders & Book-to-Bill$29.3B (+96% organic)
Q3 2026
Power orders $21.8B (+178% organic, 55 heavy-duty and 57 aeroderivative units); Electrification $5.4B (~1.4x book-to-bill).
Adjusted EBITDA & Margin$1.94B (15.4% margin)
Q3 2026
Margin up 730 bps YoY (+690 bps organic); 9M 2026 Adjusted EBITDA $4.09B (12.4% margin).
Free Cash Flow$5.41B ($15.31B 9M)
Q3 2026 / 9M 2026
Q3 operating cash flow was $6.06B; boosted by upfront customer deposits on equipment orders and SRAs.
FY2026 Guidance (Raised)$46.5B-$47.5B rev / $16B-$17B FCF
FY2026 (raised Oct 28, 2026)
Adjusted EBITDA margin guided to 13.5%-14.5%; Wind segment still guided to $400M-$500M EBITDA loss.
Total Backlog (RPO)$197B
As of Sept 30, 2026
Up $20B sequentially; management expects total backlog to exceed $200B in Q4 2026.
Gas Turbine Backlog & SRAs122 GW (64 GW firm / 58 GW SRAs)
As of Sept 30, 2026
Up from 116 GW in Q2 2026; shipped 5 GW in Q3 (20 GW/yr pace) and expects >=130 GW under contract by year-end 2026.
Electrification Equipment Backlog$42.2B
As of Sept 30, 2026
Up 60% YoY (+$15.7B), including $5B from Prolec GE; excludes ~$5B backlog at pending acquisition Trench Group.
Capex & Expansion Plan$647M Q3 ($1.43B 9M)
Q3 2026 / 9M 2026
Part of a $6B 2025-2028 capex plan (incl. $1B Prolec GE) and $5B 2025-2028 R&D commitment.
Cash & Long-Term Debt$16.8B cash / $2.6B LT debt
As of Sept 30, 2026
Fitch upgraded credit rating to A- (stable) in Aug 2026; $9.0B Trench deal expected 50/50 cash and debt at late-2027 close.
Direct Hyperscaler Share of RevenueNot disclosed
As of Q3 2026
Company reports segment totals; most datacenter demand flows through utilities, IPPs, and EPCs alongside direct orders.

What Actually Moves the Stock

01

Gas turbine slot conversion, pricing, and factory ramp

Power segment EBITDA margins jumped 800 bps YoY to 21.4% in Q3 2026 as GE Vernova converted 13 GW of slot reservation agreements into firm orders while signing 11 GW of new gas contracts. Sustaining 20 GW/year shipments now and expanding output to 24 GW in 2028 drives multi-year revenue recognition at higher pricing.

02

Electrification scale-up via Prolec GE and Trench Group

Electrification revenue rose 51% YoY (+16% organic) to $3.86 billion in Q3 2026 at a 19.1% segment EBITDA margin, backed by a $42.2 billion equipment backlog. Closing the remaining 50% of Prolec GE in February 2026 and agreeing to buy Trench Group for $9.0 billion (adding high-voltage bushings, coils, instrument transformers, and a 765 kV North Carolina plant) deepens GE Vernova's grip on transmission bottlenecks.

03

Customer deposit cash flow and capital return

Upfront milestone payments and slot reservation deposits helped propel 9M 2026 free cash flow to $15.31 billion and cash balances to $16.8 billion. In October 2026, the board doubled the share buyback authorization to $20 billion ($10.1 billion remaining after $9.9 billion repurchased since December 2024).

04

High-margin services annuity and Wind turnaround

Every heavy-duty turbine shipped expands an installed base that produces recurring multi-decade service revenue ($13.03 billion across all segments in 9M 2026). Meanwhile, resolving Vineyard Wind litigation in Q3 2026 and narrowing Wind losses ($72 million positive Q3 segment EBITDA versus -$585 million for 9M) removes a persistent valuation overhang.

The Bull Case vs. The Bear Case

The Bull Case

  • GE Vernova sits directly on the two tightest physical bottlenecks in AI infrastructure: heavy-duty gas turbines (122 GW booked or reserved) and high-voltage grid equipment ($42.2B Electrification backlog).
  • Multi-year slot visibility supports sharp margin expansion across both Power (21.4% Q3 EBITDA margin) and Electrification (19.1%), with newer, higher-priced backlog still cycling into deliveries through 2030.
  • A fortress balance sheet ($16.8 billion cash against $2.6 billion long-term debt, A- Fitch rating) lets management simultaneously fund $6 billion of 2025-2028 capex, acquire grid suppliers like Prolec GE and Trench Group, and execute a $20 billion buyback authorization.
  • Expanding the global HA and aeroderivative turbine fleet builds a high-margin, long-duration services stream that outlasts any single datacenter capex wave.

The Bear Case

  • Extraordinary 2026 free cash flow ($16B-$17B guidance) is heavily front-loaded by working-capital inflows and customer deposits; if order intake slows from record levels, FCF conversion will normalize sharply downward.
  • Roughly 58 GW of the 122 GW gas pipeline consists of slot reservation agreements rather than binding equipment backlog, leaving exposure if utilities or hyperscalers defer projects after 2028.
  • The $9.0 billion Trench Group acquisition (valued at 13x projected 2028 standalone Adjusted EBITDA before synergies and expected to close in late 2027) adds roughly $4.5 billion of future debt and regulatory integration risk.
  • The Wind segment remains unprofitable on a full-year basis ($400M-$500M guided FY2026 EBITDA loss), and global supply-chain inflation or trade tariffs can pressure fixed-price long-cycle equipment contracts.

Key Risks & Watch Items

Key Risks

  • Factory capacity, forging, casting, and specialized supply-chain bottlenecks that could delay the planned gas turbine production ramp from 20 GW/year to 24 GW/year in 2028.
  • Regulatory approval delays, currency fluctuations (EUR/USD), or integration friction on the $9.0 billion Trench Group acquisition ahead of its targeted late-2027 closing.
  • Project cancellations or deferrals by utilities and datacenter developers if grid interconnection queues, gas pipeline permits, or AI capex budgets tighten.
  • Tariff cost headwinds, warranty or quality issues across heavy-duty gas or wind platforms, and residual execution costs on legacy offshore wind projects.

Watch Items

  • Q4 2026 results and FY2027 guidance (expected January 2027) for confirmation that total backlog crossed $200 billion and contracted gas power reached at least 130 GW.
  • Quarterly conversion rate of the 58 GW gas slot reservation agreements into firm equipment backlog alongside sustained 5+ GW quarterly turbine shipments.
  • Regulatory review progress and financing terms for the $9.0 billion Trench Group acquisition (targeted to close in late 2027) and North Carolina 765 kV manufacturing ramp.
  • Wind segment EBITDA trajectory toward breakeven in 2027 following the Q3 2026 Vineyard Wind litigation resolution.

Primary Sources & Filings

Coverage (1)

Satire. Not investment advice.

Free weekly newsletter · No paywall

The Guppy Index in your inbox every week.

Every listed neocloud rated with the numbers behind each one, plus the week's sharpest AI infrastructure filings and MS Paint charts. Free, one email a week.

Read last week’s sample issue (five pieces like this, every week) →