Power Generation & High-Voltage Grid Equipment OEM (Gas Turbines, Transformers, Switchgear, and Wind)
GE Vernova manufactures the physical hardware that stands between an AI datacenter press release and an energized substation: heavy-duty and aeroderivative gas turbines, high-voltage transformers, switchgear, HVDC grid systems, and wind turbines. Across its Power, Electrification, and Wind segments, the company enters late 2026 with $197 billion in total remaining performance obligations and expects backlog to cross $200 billion in the fourth quarter.
Demand from utilities and datacenter developers has turned GE Vernova's turbine factories into a multi-year queue. By September 30, 2026, Gas Power held 122 GW of equipment backlog (64 GW) and slot reservation agreements (58 GW), with management projecting at least 130 GW under contract by year-end against an annualized factory output scaling from 20 GW in Q3 2026 to 24 GW in 2028.
Rather than just collecting turbine deposits, GE Vernova is using its cash surge ($15.31 billion in 9M 2026 free cash flow) to roll up grid bottlenecks, closing the Prolec GE buyout in February 2026 and agreeing on October 28, 2026 to acquire high-voltage component maker Trench Group for $9.0 billion. Every megawatt will be monetized, preferably with a non-refundable slot reservation deposit and a 20-year service contract attached.