everymegawattPOWER LEDGER RESEARCH
COMPANY REPORT

Hut 8 Corp.

NASDAQHUT  ·  Power-First Operator  ·  Miami, Florida, USA
Power-first AI landlord (triple-net developer) with a legacy Bitcoin/ASIC operating businessEx-Bitcoin miner (2023 Hut 8 Mining / U.S. Bitcoin Corp merger)
$123.02
+4.5% today
June 28, 2026
3.8
TOTAL GW
0.71
OPERATIONAL GW
2.23
ANNOUNCED GW
$13.8B
MARKET CAP
$3.7B
VAL / GW

A Bitcoin miner reborn as an AI landlord — $16.8B of signed take-or-pay leases on land where not a single AI watt is energized yet.

01

Overview

Hut 8 Corp. (NASDAQ: HUT) is a Miami-based, vertically integrated operator of large-scale energy infrastructure and compute. Born from the December 2023 merger of Canadian miner Hut 8 Mining and U.S. Bitcoin Corp, the company describes its business across three segments: Power (energy generation and grid-connected capacity), Digital Infrastructure (data-center development and managed services), and Compute (Bitcoin self-mining and ASIC colocation). As of year-end 2025 it managed roughly 1,020 MW across 15 sites in the U.S. and Canada; after divesting its 310 MW Ontario gas portfolio to TransAlta, it cites ~710 MW under management.

The strategic pivot is the story. Hut 8 is repositioning its grid-secured land-and-power pipeline away from Bitcoin economics and toward hyperscale AI tenants, signing long-duration triple-net, take-or-pay leases where Hut acts as the landlord/developer rather than the GPU operator. The two flagship campuses are River Bend in southeast Louisiana (Entergy power) and Beacon Point in Nueces County, Texas (AEP / ERCOT). Both are being built to NVIDIA's DSX gigawatt-scale reference architecture using Tier 1 partners — Vertiv, Jacobs, and the utilities themselves.

Behind the lease book sits an 8,375 MW development pipeline (per Q1 2026): 830 MW under construction, 550 MW under development, 1,680 MW under exclusivity, and 5,315 MW under diligence. Crucially, none of the AI/HPC capacity is energized today — the first River Bend data hall is not expected online until Q2 2027 — so the entire AI thesis is contracted and planned, not operating.

02

Market Thesis

The power angle is that Hut controls scarce, grid-secured megawatts at a moment when interconnection queues, not chips, are the binding constraint on AI build-out. Hut has converted that scarcity into cash-flow certainty: 597 MW of IT capacity is signed under 15-year triple-net, take-or-pay leases with no termination-for-convenience, for $16.8B of base-term contracted revenue (up to ~$25.1B if renewals are exercised). The River Bend lease (245 MW, $7.0B) is with Fluidstack, backstopped by Google; Beacon Point (352 MW, $9.8B) is with an undisclosed high-investment-grade tenant. For a former miner, that is a transformation from spot-priced, halving-exposed revenue to bond-like, inflation-escalated rent.

The bull case: Hut is becoming a NeoCloud landlord with the credit profile of a triple-net REIT and the growth runway of a hyperscaler supplier. Sell-side enthusiasm is loud — targets clustered $124-$156 with outliers to $226 — predicated on Hut executing the 1 GW+ at each campus, monetizing the 1,680 MW exclusivity book, and re-rating off contracted EBITDA once data halls energize in 2027.

The bear case is timing and balance sheet. Today the company is still a Bitcoin miner: Q1 2026 revenue was just $71.0M, adjusted EBITDA was $(250.5)M, and it posted a $(253.1)M net loss (largely unrealized crypto marks). Zero AI watts are energized; first revenue at River Bend is Q2 2027, Beacon Point energization Q1 2027 — multi-year execution risk on power delivery, capex, and construction stands between the signed $16.8B and actual rent. The valuation already capitalizes contracts that have not poured a slab, and the headline 710 MW 'under management' mixes managed-services and a King Mountain JV, overstating cleanly-owned energized capacity.

KEY DATA
Price$123.02
Market cap$13.8B
Total GW3.8 GW
Operational0.71 GW
Contracted0.83 GW
Announced2.23 GW
Val / GW$3.7B
EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEHUT · 1 / 3
HUT 8 CORP. · POWER LEDGER RESEARCHJUNE 28, 2026
03

Approach

Hut leases capacity OUT to AI tenants (Fluidstack et al.) under triple-net take-or-pay terms — it is the landlord/developer, not the GPU operator — placing it on the power/land side. It is pulled up from pure-lessor by an operating Bitcoin self-mining and ASIC-colocation Compute segment that still drives nearly all current revenue.

OWNS POWER · LANDSELLS COMPUTE · NEOCLOUD
04

Power Position

Operational · energized0.71 GW
Contracted · not operational0.83 GW
Announced · pipeline2.23 GW

Operational power is energized and earning today. Secured is grid-secured or under construction — not yet drawing load. Announced is pipeline — committed sites and stated intent. The gap between them is where the risk, and the re-rating, live.

05

Financials

LINE ITEM
VALUE
PERIOD
Total revenue$71.0MQ1-26
Compute revenue$66.0MQ1-26
Power revenue$3.7MQ1-26
Adjusted EBITDA$(250.5)MQ1-26
Net loss (incl. $295.7M crypto marks)$(253.1)MQ1-26
Cash + Bitcoin holdings~$1.3BMar 31 2026
BTC-backed facility cost of debt9.0% to 7.0%post-Q1-26 refi
Illustrative figures — auto-populated from latest SEC filings. Verify before relying.
EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEHUT · 2 / 3
HUT 8 CORP. · POWER LEDGER RESEARCHJUNE 28, 2026
06

Sites & Contracts

SITE
LOCATION
CAPACITY
STATUS
Operating Bitcoin/ASIC + colocation fleet (15 sites)
Alberta, New York, Texas (US & Canada)
710 MW
OPERATIONAL
River Bend AI Campus
Southeast Louisiana (Entergy)
330 MW
SECURED
Beacon Point AI Campus
Texas (ERCOT / AEP)
352 MW
SECURED
Committed pipeline (development + exclusivity)
Multiple US sites (Texas, Illinois, etc.)
2.2 GW
ANNOUNCED
CONTRACTS & OFFTAKE
COUNTERPARTY
BASIS
TERM
POWER
VALUE
ARR
Fluidstack (Google-backed)
River Bend campus — 245 MW IT, triple-net take-or-pay AI lease, first data hall Q2 2027
15 years
245 MW
$7.0B base-term
~$467M/yr base-term avg
Undisclosed high-investment-grade tenant
Beacon Point (Nueces County, TX) — 352 MW IT, triple-net take-or-pay, no termination-for-convenience; energization Q1 2027
15 years (+ three 5-yr options)
352 MW
$9.8B base-term (up to $25.1B all-in w/ both campuses' renewals)
~$653M/yr base-term avg
American Electric Power
Beacon Point interconnection — executed agreement for 1,000 MW of utility capacity (ERCOT)
n/a
1000 MW
1 GW secured
TransAlta
Divestiture of 310 MW Ontario natural-gas generation portfolio
n/a
Closed; reduces 'under management' to ~710 MW
TOTAL
1597 MW
$16.8B
$1.1B
07

Risk

Zero AI/HPC capacity energized; first River Bend revenue not until Q2 2027.
Deeply negative current EBITDA; business still a spot-priced Bitcoin miner today.
Beacon Point's anchor tenant is undisclosed — credit and concentration opacity.
$16.8B is contracted, not built; multi-year power, capex, construction execution risk.
Earnings swing on unrealized Bitcoin marks ($295.7M hit in Q1-26 alone).
Headline 710 MW mixes managed-services and JV capacity, overstating clean owned-energized power.
Valuation already capitalizes leases years from energization.

Recent News

SEC · PRESS · NEWS
Jun 25 2026StreetInsider
BTIG raises Hut 8 price target to $150, keeps Buy
BTIG's Gregory Lewis lifted his HUT target from $115 to $150 on the company's accelerating AI data-center momentum.
Jun 24 2026BTIG
BTIG raises Hut 8 price target to $150 from $115, reiterates Buy
Bullish revision reflects Street re-rating of Hut's contracted AI lease book ahead of 2027 energization.
Jun 04 2026SEC 8-K
Beacon Point prices $4.25B 6.129% senior secured notes due 2042
Hut 8 subsidiary Beacon Point DC LLC priced $4.25B of non-recourse notes to fund the 352 MW Nueces County, Texas AI data center.
May 07 202624/7 Wall St.
Canaccord nearly doubles Hut 8 price target to $130
Canaccord raised its HUT target from $70 to $130, citing the pivot from Bitcoin mining to enterprise-grade AI data-center infrastructure.
May 06 2026Bloomberg
Hut 8 lands 352 MW, $9.8B Texas AI data center lease at Beacon Point
Hut 8 commercialized the first phase of its 1 GW Beacon Point campus with a 15-year, 352 MW lease to an investment-grade tenant worth up to ~$25.1B with options.
May 06 2026CoinDesk
Hut 8 shares jump ~30% on $9.8B AI data center lease
HUT stock surged nearly 30% after the Beacon Point lease lifted total contracted AI capacity to 597 MW and ~$16.8B in base-term value.
May 06 2026PR Newswire
Hut 8 reports Q1 2026: revenue $71M, net loss $253M
Q1 revenue rose 226% YoY to $71M on the compute segment, but a $253M net loss reflected mark-to-market crypto losses; development platform stands at 9+ GW.
May 06 2026PR Newswire
Hut 8 commercializes first phase of 1 GW Beacon Point campus with 15-year, 352 MW IT lease worth $9.8B
Triple-net take-or-pay lease with an undisclosed investment-grade tenant lifts signed IT capacity to 597 MW and contracted revenue to $16.8B.
May 06 2026Yahoo Finance
Hut 8 stock surges ~27% on $9.8B Beacon Point lease with undisclosed tenant
Market rewards the second hyperscale AI lease, validating Hut's pivot from miner to AI data-center landlord.
Apr 30 2026DataCenterDynamics
Hut 8 closes $3.25B investment-grade notes for River Bend campus
Hut 8 sold $3.25B of BBB-rated senior secured notes to finance its Google/Anthropic-backed River Bend AI data center in Louisiana, billed as the first IG construction bond for a single-sponsor project.
Feb 25 2026PR Newswire
Hut 8 reports Q4/FY2025 results; ~1,020 MW under management across 15 sites
Full-year results frame the managed-capacity base ahead of the Ontario gas divestiture to TransAlta.
Dec 17 2025CoinDesk
Hut 8 signs 245 MW, $7B River Bend lease with Fluidstack
Hut 8 signed a 15-year, $7B lease with Fluidstack (backed by Google, tied to an Anthropic partnership) for 245 MW at its Louisiana River Bend campus, with a ROFO for 1,000 MW more.
DISCLAIMER

This report is produced by Every Megawatt for informational purposes only and does not constitute investment advice, a recommendation, or an offer to buy or sell any security. Figures are illustrative and auto-generated from public filings; they may be incomplete or inaccurate and should be independently verified. Every Megawatt makes no warranty as to accuracy and accepts no liability for any use of this material.

EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEHUT · 3 / 3