3.0
TOTAL GW
1.47
OPERATIONAL GW
0.18
ANNOUNCED GW
$4.2B
MARKET CAP
$1.4B
VAL / GW

A vertically integrated Bitcoin miner sitting on ~3.0 GW of owned, low-cost power — now racing to convert energized crypto megawatts into contracted AI before the debt clock runs out.

01

Overview

Bitdeer Technologies Group (Nasdaq: BTDR) is a Singapore-headquartered, vertically integrated Bitcoin-mining and digital-infrastructure operator founded in 2018 by Jihan Wu, co-founder of Bitmain. Its FY2024/FY2025 Form 20-F describes a business that spans five layers: datacenter development and operation, proprietary self-mining, cloud hashrate and hosting services, and — uniquely among miners — its own mining-ASIC silicon. The SEALMINER roadmap (the 4nm SEAL01 chip rated ~18.1 J/TH, with SEAL02/SEAL03 generations following) is the company's bid to become the first fully integrated miner, controlling everything from chip to power to hashrate.

The asset base is a global fleet of owned electrical capacity. Per the June 18, 2026 Form 6-K (May 2026 operations update), Bitdeer controls 3,003.5 MW of total global electrical capacity across the US (Rockdale TX, Massillon/Clarington/Niles OH, Knoxville TN, Wenatchee WA), Bhutan (Jigmeling 500 MW, Gedu 100 MW), Norway (Tydal, Molde), Ethiopia (Oromia), Canada (Fox Creek AB) and Malaysia (Cyberjaya). Roughly 1.47 GW is energized and operating today — almost entirely Bitcoin mining — with the balance in a contracted/pipeline tier earmarked for crypto-to-AI conversion.

The pivot underway is from hashrate to AI infrastructure via two routes: colocation (leasing converted, energized halls to AI tenants) and a still-nascent owned GPU cloud. As of May 2026 the AI Cloud business runs 4,248 GPUs (H100/H200/B200/GB200/GB300) at ~90% utilization for roughly $69M of annualized run-rate revenue — real, but a rounding error against a ~$750M-annualized self-mining business. The company self-mined 921 BTC in May 2026 (+370% Y/Y) on 70.2 EH/s of self-mining hashrate (83.1 EH/s total under management).

02

Market Thesis

The power thesis is straightforward: Bitdeer already owns and energizes the scarcest input in AI infrastructure — interconnected, cheap megawatts — and bought most of it years ago at crypto economics. Converting an energized 225 MW hall in Tydal or a 563 MW campus in Rockdale into AI colocation is faster and cheaper than greenfielding a substation queue. If even a fraction of the 1.35 GW contracted tier signs colo leases at hyperscaler-grade rates, the revenue and margin profile re-rates entirely away from Bitcoin's price beta. The vertical integration — owning the land, the power contract, the datacenter, and increasingly its own silicon — is the structural edge.

The bear case is that, as of mid-2026, almost none of this has happened yet. The online 1.47 GW is ~entirely crypto; the lead colocation deal (Tydal, Norway) is still only 'in advanced negotiations' with no signed lease; and the largest contracted block — Clarington's 570 MW (~42% of the contracted tier) — sits on leased Monroe County Port Authority ground and is under active litigation, with American Heavy Plate Solutions (MHR-backed) seeking a permanent injunction to bar construction. Niles' 300 MW is grid-secured but not targeted to energize until Q4'28. Crypto-to-AI conversions also derate MW (electrical capacity is not IT/critical AI load), so the headline gigawatts overstate deliverable AI compute.

Underneath sits the real pressure: ~$1.9B of borrowings against $297.7M of cash and a Q1'26 net loss of $159.5M. Bitdeer is funding an AI buildout, a SEALMINER capex cycle, and self-mining expansion simultaneously off a balance sheet leaning on convertibles and related-party debt. The bull needs signed colo leases and energized AI load before the cash and the conversion window close; the bear sees a levered miner with a great map of megawatts and very little contracted AI revenue to show for it yet.

KEY DATA
Price$17.15
Market cap$4.2B
Total GW3.0 GW
Operational1.47 GW
Contracted1.35 GW
Announced0.18 GW
Val / GW$1.4B
EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEBTDR · 1 / 3
BITDEER TECHNOLOGIES GROUP · POWER LEDGER RESEARCHJUNE 28, 2026
03

Approach

Owns the full stack — land, power contracts, datacenters, ASIC silicon, and a small GPU cloud — but today the AI monetization is mostly a future colocation-lessor play plus a tiny (~$69M ARR) neocloud. Online capacity is ~entirely crypto. Leans toward owning power and converting it, not yet a pure GPU operator.

OWNS POWER · LANDSELLS COMPUTE · NEOCLOUD
04

Power Position

Operational · energized1.47 GW
Contracted · not operational1.35 GW
Announced · pipeline0.18 GW

Operational power is energized and earning today. Secured is grid-secured or under construction — not yet drawing load. Announced is pipeline — committed sites and stated intent. The gap between them is where the risk, and the re-rating, live.

05

Financials

LINE ITEM
VALUE
PERIOD
Total revenue$188.9MQ1-26
Net loss$(159.5)MQ1-26
Adjusted EBITDA$14.4MQ1-26
Self-mining revenue$146.9MQ1-26
AI Cloud ARR~$69MMay-26
Cash & equivalents$297.7MQ1-26
Total borrowings~$1.9BQ1-26
Illustrative figures — auto-populated from latest SEC filings. Verify before relying.
EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEBTDR · 2 / 3
BITDEER TECHNOLOGIES GROUP · POWER LEDGER RESEARCHJUNE 28, 2026
06

Sites & Contracts

SITE
LOCATION
CAPACITY
STATUS
Rockdale (online)
Rockdale, Texas, USA
563 MW
OPERATIONAL
Jigmeling
Jigmeling, Bhutan
500 MW
OPERATIONAL
Massillon (online)
Massillon, Ohio, USA
174 MW
OPERATIONAL
Gedu
Gedu, Bhutan
100 MW
OPERATIONAL
Molde
Molde, Norway
84 MW
OPERATIONAL
Oromia
Oromia Region, Ethiopia
50 MW
OPERATIONAL
Cyberjaya (online)
Cyberjaya, Malaysia
2 MW
OPERATIONAL
Tydal (phases 1+2)
Tydal, Norway
225 MW
SECURED
Knoxville (phases 1+2)
Knoxville, Tennessee, USA
86 MW
SECURED
Wenatchee
Wenatchee, Washington, USA
13 MW
SECURED
Clarington
Clarington, Ohio, USA
570 MW
SECURED
Niles
Niles, Ohio, USA
300 MW
SECURED
Fox Creek
Fox Creek, Alberta, Canada
101 MW
SECURED
Massillon (pipeline)
Massillon, Ohio, USA
47 MW
SECURED
Cyberjaya (expansion)
Cyberjaya, Malaysia
9.5 MW
SECURED
Rockdale (expansion)
Rockdale, Texas, USA
179 MW
ANNOUNCED
CONTRACTS & OFFTAKE
COUNTERPARTY
BASIS
TERM
POWER
VALUE
ARR
AI Cloud customers (undisclosed)
GPU cloud rental — 4,248 GPUs (H100/H200/B200/GB200/GB300), ~90% utilization
Run-rate
Small fleet incl. 2 new GB300 NVL72 clusters
~$69M ARR
Tydal, Norway colocation tenant (unnamed)
Colocation lease for converted 225 MW (50+175 MW) crypto-to-colo capacity
Not signed — 'in advanced negotiations' (May 2026)
225 MW
No lease executed yet
Local Ohio utility (Clarington)
570 MW grid power under utility contract; 30-yr ground lease w/ Monroe County Port Authority
Timing 'to be updated' — under litigation
570 MW
Largest contracted block (~42% of tier)
Grid / transmission (Niles, OH)
300 MW grid-interconnected site (41.8 acres owned), transmission-line-extension agreement
Target energization Q4'28
300 MW
Long-dated contracted capacity
TOTAL
1095 MW
$69M
07

Risk

Lead colo deal (Tydal) still unsigned; almost zero contracted AI revenue to date.
Clarington 570 MW (~42% of contracted tier) under injunction litigation; construction could be barred.
~$1.9B debt vs $297.7M cash; Q1'26 net loss of $159.5M.
Online 1.47 GW is ~entirely crypto — fully exposed to Bitcoin price and halving economics.
Crypto-to-AI conversions derate MW; headline gigawatts overstate deliverable AI load.
Niles 300 MW not energized until Q4'28; long-dated, capital-intensive pipeline.

Recent News

SEC · PRESS · NEWS
Jun 24 2026Benzinga
Citizens initiates Bitdeer at Market Outperform, $35 target
Citizens launched coverage with a Street-high-tier $35 target, citing the owned-power-to-AI conversion optionality.
Jun 18 2026GlobeNewswire (Bitdeer IR)
Bitdeer May update: AI Cloud ARR holds ~$69M, deploys 2 GB300 NVL72 clusters
Bitdeer's May operations update kept AI Cloud ARR near $69M at 90% GPU utilization, brought two NVIDIA GB300 NVL72 clusters into production, and reported Tydal, Norway colocation talks in advanced stages with active dialogue in Ohio and Texas.
Jun 18 2026SEC Form 6-K / GlobeNewswire
May 2026 operations update: 3,003.5 MW total capacity, $69M AI Cloud ARR, 921 BTC mined
Reported 3.0 GW global electrical capacity, AI Cloud ARR steady at ~$69M on 4,248 GPUs, and Tydal colocation still in advanced negotiations.
Jun 16 2026DataCenterDynamics
Bitdeer plans 750MW data center campus in Ohio, faces local moratorium
Bitdeer contracted to buy ~257 acres in Portage County, Ohio for a 15-building campus scalable to 750MW (150MW phase one), a roughly $300M, five-year project that must clear a local data center moratorium running through early November.
May 15 2026Yahoo Finance (Blockspace)
KBW keeps $11.50 target on Bitdeer, flags ASIC inventory buildup and cash burn
Keefe, Bruyette & Woods reiterated Market Perform and an $11.50 target after Q1, warning SEALMINER inventory surged 143% QoQ to $613M as external rig sales fell 84%, raising writedown risk and projecting negative free cash flow through 2026.
May 15 2026StockTitan
Q1 2026: revenue $188.9M (+170% Y/Y), net loss $159.5M, adj. EBITDA +$14.4M
Revenue jumped on self-mining expansion but net loss widened to $159.5M; adjusted EBITDA swung positive to $14.4M.
May 14 2026Investing.com
Bitdeer Q1 2026 earnings miss: revenue $188.9M, net loss $159.5M
Bitdeer reported Q1 revenue of $188.9M (up 170% YoY on a 551% jump in self-mining hashrate) but a $39.0M gross loss and $159.5M net loss as it pivots toward AI cloud and colocation and de-emphasizes external SEALMINER sales.
May 12 2026GlobeNewswire (Bitdeer IR)
Bitdeer April update: AI Cloud ARR ~$69M, up 60% MoM; 783 BTC mined
Bitdeer's April operations update showed AI Cloud ARR reaching ~$69M (up 60% MoM), Bitcoin production up 372% YoY to 783 BTC, and Tydal, Norway colocation negotiations in advanced stages.
Apr 15 2026GlobeNewswire (Bitdeer IR)
Bitdeer March update: AI Cloud ARR ~$43M, up 105% MoM
Bitdeer's March operations update reported AI cloud ARR of ~$43M (up 105% MoM), ~70 EH/s of mining capacity, and ongoing Tydal, Norway colocation tenant negotiations it expected to close in the near term.
Mar 30 2026The Block
Bitdeer inks deal to build Norway's largest AI data center for Nvidia chips
Bitdeer subsidiary Tydal Data Center engaged contractor DCI to develop a 180MW AI colocation facility on carbon-free hydropower built around Nvidia's Vera Rubin architecture, targeting completion by December 2026.
Feb 24 2026SEC Form 6-K
Bitdeer issues $325M 5.00% convertible notes due 2032, repurchases 2029 notes
Bitdeer priced an upsized $325M of 5.00% convertible senior notes due 2032 plus a registered direct equity offering, using ~$315M net proceeds for capped calls and to repurchase $135M of its 5.25% 2029 convertible notes.
Feb 10 2026Blockspace
Bitdeer faces lawsuit over Clarington 570 MW data center
American Heavy Plate Solutions (MHR-backed) sued Bitdeer and the landowner seeking an injunction to bar construction over restrictive covenants in the industrial park.
DISCLAIMER

This report is produced by Every Megawatt for informational purposes only and does not constitute investment advice, a recommendation, or an offer to buy or sell any security. Figures are illustrative and auto-generated from public filings; they may be incomplete or inaccurate and should be independently verified. Every Megawatt makes no warranty as to accuracy and accepts no liability for any use of this material.

EVERYMEGAWATT.COM · ILLUSTRATIVE — NOT INVESTMENT ADVICEBTDR · 3 / 3